ON CALL 24 HOURS - Pasadena, TX - (713) 475-6100 Groves, TX - (409) 727-7384 Sulphur, LA - (337) 882-6887
Pasadena, TX (713) 475-6100
Groves, TX (409) 727-7384
Sulphur, LA (337) 882-6887
ON CALL 24 HOURS

The Ultimate Trick to Getting Approved Products on Schedule

AMLs for construction mega-projects are built to ensure quality. This assurance of quality is great for the end user and the surrounding community the facility is in. However, it does tie your hands when sourcing material. You’ve got to plan ahead. 

The top-notch products or brands on your projects’ AML won’t always be available on short notice…at a great price…from the nearest supplier to the job site. And sometimes shit happens!.

  • What if the material you ordered came up missing? It was somehow lost in the field (again). Has that ever happened? Of course it has — it happens on every large capital project and it kills your schedule!  
  • What’s the procurement cycle for field buys? What’s the lead time? How many days are wasted between the time you identify a need in the field to the time your Team gets the material in their hands to install? 5-7 working days? 7-10 working days?  More?  
  • What if there’s a snag in the supply chain? Material shortages and shipping delays suck, but they happen, and no more than ever.
  • What if a material purchase totally slipped under the radar and you forgot to order it?  It does happen, no matter how hard we try to stay on top of things. 

There are a ton of little things you can do to make sure your AML products are on-site and on schedule… But there’s only one solution you really need. Call in the TROOPS.

Deploy the PROJEXX GROUP From Troop Industrial

Stop juggling phones and emails double-checking needs, orders, lead times, and inventory. You don’t need to go it alone. The PROJEXX GROUP is your ultimate ace in the hole.

Think of our PROJEXX GROUP as a special ops team for on-time, on-site AML products. We’re armed and ready with key advantages:

  • Material Waiting On You...Instead Of You Waiting On Material
  • Drastic Reduction In Material Cost
  • Drastic Reduction In Manpower Cost
  • Improved Profit Margins
  • Cloud-Based Material Management
  • Anytime-Anywhere Order Tracking
  • Anytime-Anywhere Mill Test Reports
  • Anytime-Anywhere Spend Tracking
  • Improved Morale
  • Improved Timeline
  • Consolidated Billing

With total order tracking and tech-enhanced material management, your project can move ahead on schedule and on target with no AML material surprises.

Pre-Plan Like a Boss

It’s not your job to wait on AML products. Those products should be waiting on you. You know what you are building in advance.  When you deploy our special ops team, we make sure all key AML material is on-site and ready to rock before the first bootprint is in the dirt. Become a pre-planning genius with the expert guidance and premier inventory monitoring of a team that knows the ropes.

The PROJEXX GROUP squashes needless downtime with predictive project intel. Our team has been at this for more than 20 years. We’ve seen it all. That means we can often predict the material you’ll need before you’ve even ordered it. Sometimes we’re aware of market conditions that mean you’ll need to procure AML products way ahead of time. When that happens, we alert you immediately. 

Careful pre-planning and proactive solutions will send you flying past hurdles that would send other projects face-first into the mud.

With Our Intel, You’re Practically Psychic

The PROJEXX GROUP powers you up with cloud-based, real-time material tracking. Keep a steady bead on AML material inventories on- and off-site — from anywhere, at any time, on any device with a browser — and see live statuses for every order. But that’s just the beginning.

Our material management system puts everything in your hands:

  • Order Acknowledgements
  • Live Mill Test Reports (MTRs)
  • Proof of Delivery
  • Invoices
  • Current Material Spend
  • Job Performance Metrics / Key Performance Indicators (KPIs)

This is the closest you’ll ever get to reading minds and seeing the future. The intel you’ll have through our system makes material management seamless and saves mega projects millions. Most importantly, you’ll always have the status of your AML products in the palm of your hand.

Track More. Save More. Stay on Schedule.

The real trick to getting AML material on schedule is teamwork. Call in the PROJEXX GROUP and you’ll always be prepared. Including an expert in your planning meetings means you’ll get the high-quality, name-brand industrial products you need ahead of schedule. That’s efficiency in action.

Sick of delays and headaches? Let’s talk.